Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Device model | FTech-MFSH322 | ||
performance |
Temperature control range | Room temperature - 1650ºC | |
Operating temperature | ≤ 1600ºC | ||
Temperature control accuracy | <1000±0.1ºC; ≥1000±1ºC | ||
Constant temperature fluctuation | ±1ºC (test point is 1000ºC) | ||
Temperature equalization | ±3ºC (test point is 1000ºC) | ||
Heating rate | It is recommended that the temperature below 1000 degrees should be ≤10ºC/min, and the fastest heating speed should be ≤30ºC/min. | ||
Cooling speed | Above 700ºC≤10ºC/min | ||
Furnace surface temperature | The surface temperature of the furnace body is less than room temperature +10 (the measuring point is 1000ºC) | ||
constitute |
Exterior | Cold rolled steel plate, surface resistant coating | |
Furnace body | 1700 ceramic fiber | ||
sensor | Type B thermocouple | ||
Heating element | Silicon molybdenum rod | ||
Cooling fan blades | Axial fan | ||
Furnace structure | Double-layer shell structure, equipped with air cooling system | ||
controller |
control method | PID control | |
Setting display | Digital settings/digital display | ||
Over temperature protection | Controller integrated type | ||
Over temperature setting | Digital settings | ||
Run function | Customized operation/programmed operation (30-segment program temperature control) | ||
Additional features | Deviation correction, power outage compensation, key lock function | ||
timer | 1 minute - 99 hours 59 minutes and 999 hours 50 minutes digital setting, automatic operation, quick automatic stop | ||
Safety | working environment | RT±5-40ºC | |
Guarantee of use | Open door, power outage, over-temperature alarm, leakage protection, over-temperature protection | ||
Specification |
Furnace size | 300*200*200mm (D*W*H) | |
Dimensions | 710*600*1070mm(D*W*H) | ||
weight volume | 187kg | 12L | |
voltage | 220V50HZ | ||
input power | 5KW _ | ||
Factory list |
Box type electric stove | One MFLX322-17 | |
high temperature gloves | caston pair | ||
Crucible tongs | 40LM a handful | ||
Pad bricks | A piece of corundum | ||
Manual | one serving | ||
Instrument manual | one serving | ||
Warranty Card | one serving | ||
Optional items |
Mobile hob | Stainless steel | |
exhaust vent | Inner diameter 20mm upper part | ||
Touch screen instrument 485 conversion interface | 50-segment programming can be connected to the computer. Through a dedicated computer control system, functions such as remote control, real-time tracking, historical recording, and report output for a single or multiple electric furnaces are completed. |
Basic parameters | Working voltage: 220V±10%, 50~60HZ ·Power: 1KW·Working environment temperature: 5~32ºC·Relative air humidity: ≤80%·System ultimate vacuum: 1.0*10-4Pa·Pumping rate: N2 --33 L/s, He--39 L/s, H2--32 L/s |
TVP - 9 Mechanical Pump | Pumping rate: 9L /S·Motor power: 0.75KW ·Ultimate pressure 4 *10-2Pa |
Molecular pump control power supply |
Voltage: 200~240V·Output power: 150W·Acceleration time: 3 minutes·Output frequency: high speed 704Hz±10% low speed 430 Hz±10% |
F-1 60/620C molecular pump | Lubricating oil quantity | 15 0ml | Compression ratio | N2:10 of 5 H2:6*10 of 4 |
Start Time | < 10min | Cooling water temperature | < 25 ºC _ | |
Output frequency | 400Hz+10Hz | The output voltage | 120V | |
Starting current | 5A | Working current | 2A | |
Air inlet diameter | DN 160LF | Exhaust port diameter | KF40mm | |
Pumping rate | 600L/s | ultimate pressure | 6 *10-7Pa | |
Composite vacuum gauge | Measuring range: 1.0x10 - 1.0x10-5pa Number of detection channels: 2 channels Display mode: LED digital display Power consumption: 55W Control accuracy: ±1% Response time: <1S |
1.What's the delivery time?
About 2~3months.
2.What's your guarantee terms?
The warranty of all products is 1 year. And we can supply life-long technical support.
3.Can you supply training?
We can supply training in our factory and online training for free.If onsite installation and training are required,please pay for tickets,accommodation and salary.